Point 36 (Siemen’s Distribution Centre) Goole
LED Electrical have supplied over 1km of bespoke 185mm aluminium wired armour cable to power part of the Siemens Mobility distribution centre in Goole, East Yorkshire. AWA cable helps to prevent induced current in the armour of the cable. All cable accessories such as glands and earthing cable was also supplied to complete this project. Over 200m of LSZH SWA cable, 180m of 6mm 3C SWA and 350m of 16mm 4C SWA and 20 Schill cable reels were sent for the completion of this project.
